VERB: to engage in fanciful daydreaming OR to round up loose skeins of yarn 'captured' by my cats.
12.12.2007
12.08.2007
Crappy week saved by knitting

Here's the CatMan's Tychus. Project specs: Cascade 220 in black and charcoal grey done on #9 Brittanys. The yarn is held doubled which I found to be a pain in the patootie, but it finished nicely. If I was knitting it again, I would cast on a few more stitches to make it a bit longer when the brim is rolled up. Of course the CatMan is wearing it now (I think 'cause he likes it and not just because I knit him something.)
When I finished the hat, I immediately cast on an easy, no-thinking project. The Regia 6-ply is nice and wooly with a bit more heft than most of my other socks, so I'm looking forward to finishing these and getting them on my toodies! 11.24.2007
Blame the bird!
- Directions and phone number for the mutual acquaintance we were picking up on our way out of town? still on the kitchen table.
- The first annual post-Tdinner dip in Lake George in which The CatMan participated? no camera.
- Forgetting a pack any type of hair grooming implement? check.
- Forgetting my purse at the Hampton Inn and backtracking 20 minutes to retrieve it? check.
- The picture of the giant bald eagle sitting in a tree south of Shoreham? oh right, no camera.

11.18.2007
Glove Love
11.14.2007
Two down, one to go

Edited to add - looks like I've got another project before the 'me festiveness'.
11.03.2007
Why you are supposed to make your bed
It was EOM work time this week, so not a whole lot of knitting got done. I did however sneak in a little project that has to be done by Wednesday, so I'm off to knit for bears.
10.27.2007
Cleaning up the corners.
Project specs - Lang's Jawoll Color Superwash 549-65 colorway (olive green with copper and blue shadings. Done on Brittany #2 DPNS. I knit one size up from the pattern (an addition of 4 stitches) and still used less than one skein of yarn.
The rain is also aiding and abetting my sinus headache, so I foresee a curl-up on the couch with a few cats and some knitting. The weekly domestic goddessing can wait.
And this was my birthday card from the CatMan (see - I really did have to clean off my desk!)
Dog: "Seriously, you might want to stop and give this a little more thought."
But the best part is the inside of the card- the kitty, wearing a party hat, snoozily wrapped around a third ball of yarn.
10.21.2007
Field Trip

The Regia above is destined to become a pair of these. However, I've got to finish my test pair first. A couple hours in the car speeded that process up a bit.10.07.2007
A beautiful fall day

9.29.2007
Boyfriend
How cute is that freakin' tail? And no, he does NOT like to be compared to Mr. Bigglesworth, so don't even go there.
9.22.2007
It's all in the planning

Project specs: Wisp from Knitty, using Madil Kid Seta (70% kid mohair, 30% silk) in Shade on #7 Inox circ needles. I used just one skein and blocked the scarf to just shy of 48" long x 10" wide.
So while the CatMan is doing manly guy things with his friends this weekend, I'm enjoying homemade bean soup, clean laundry, watching DVDs, and planning some upcoming knit projects. On the docket for October:
A pair of socks for a girlfriend with an October birthday (in this colorway).
Some baby shower knitting for a co-worker including these booties and this top-down cardi


Best part of the whole she-bang? I'm knitting from stash. Unless, in typical Gathering Wool fashion, I run out with a row to go.
9.14.2007
I am the Eggplant koo-koo-cachoo
Project specs: Zitron Trekking XXL in color 76 (purple/navy/moss brown/orange). Pattern ribbing based on Nicole's "9-to-5" sock pattern with my standard heel and foot. Needles: #2 Brittany DPNs. And then I immediately cast on for the Autumn Wisp. It's what got me through 18 minutes of GW and the Democratic response last night.
9.09.2007
Burning it up
Project specs: odds and ends of feltable wool on #10 Addis.Project mods: I made I-cord handles which I then criss-crossed across the tote body to add some reinforcement.
Here's a closeup of the first Eggplant sock. I tried to get some detail of the faux ribbing, but it's hard with the yarn. I'm using the stitch pattern from here, but the rest of the sock is my usual suspect. 
Yesterday, we attended the annual corn roast/bonfire. We cooled down to the lovely breeze blowing through the Underhill valley. This is the bonfire pile: see the teeny-tiny pallets on top of the pile? That's because I am standing in the first row of chairs very far away. Why?
Because this was hot enough to melt anything closer!
So long Summer 2007!9.02.2007
Labor Day is a day of rest!
You really can't appreciate the softness of the yellow, but trust me all 17 wall surfaces of the CattyAbode's 3rd floor positively glow sunlight. While in Vermit's few weeks of 95 degree temps, this may not be our first color choice, the remaining 49+ weeks of the year need happy, sunny yellow.
These are also done!
Size 14 Sasquatch Socks knit with Lion Brand WoolEase in Grey Heather and Seaspray on #7 Brittany DPNs. That would be one of my size 9.5 Tiger Socks for scale.
And this (almost!)
Felted Stripe Tote from Leigh Radford's One Skein.
And in case you were wondering about the new button on the side bar, you can go here to read the rest of the story. I'm freeing myself from the labor of sweater-making. At least for now.
8.26.2007
The price of productivity
Thanks be to Otter Creek for the medicinal skills....um, it's like holding an ice pack...yeah, that's it.
8.21.2007
And now back to our regularly scheduled knitting...
I finished the Crazy Anklets.

Project specs: this standard sock pattern on #2 Brittanys using leftover Regia Crazy Colors with a stash skein of Koigu KPM, dye code 2160/103.
Also finished was a stealth project which I can show, but can't tell you who it's for just yet (unless you check out my Ravelry page).

Project specs: Persnickety Knitter's Arrowhead Lace Headband pattern using stash remnant wool on #7 Addis. This project was instant gratification and I really hope the giftee loves them as much as I loved making them.
There was some knitting on the Size 14 socks (I really want these off the needles by the weekend.) And because I just picked up this book, I felt compelled to start the Felted Striped Tote using up my autumn-hued wool remnants.
Next on the needles is another pair of socks using a new Trekking colorway and (gasp!) a new sock pattern. Stay tuned!
8.17.2007
Thanks, Mother Nature!
(this is outside our bedroom window)The Weather Service is hesitant to call it a "tornado", but whatever the little weather/microburst/storm cell was labeled, it still spelled trouble. The farm was very fortunate. We had some tree damage, a few small structural issues, and a mess of the flowers - but everyone is ok.
(Neighbor cats Bart and Lexie are glad the excitment is over for now!)Do you like our topiaries?

And the old pumphouse still stands -

8.11.2007
At least something's getting finished around here!
Project specs: Oat Couture's Tropical Tee knit in Classic Elite's Classic Silk (a cotton/silk blend), Colorway 6953 on Size 10 circs (bias neckline done on #6 dpns.) I used just under 7 skeins. Pattern mods: Horseshoe lace hem, knitted bias neckline. (And yes, that is a primed wall you see behind me.)
Exhibit 2: 2008 Red Scarf #1
Project specs: Pretty much the same as #2. I used Lambs Pride in "Khaki" for the main colorway, with the remnants on the ends. Finished length is about 63". (I still have a little steam blocking to do.)
I've decided to backburner MS3 for a variety of reasons. Even if I decide to frog it, I've learned some good lessons: I can bead and I like lace on a smaller scale. In fact, I've got a project mulling over in the back of my mind even now.
And speaking of unfinished stuff - Mr. Cat loves me enough not to care if he has to nap on the taped-off floor.
8.04.2007
Way too much
I've got 4 WIPs, 3 on the launch pad, and a couple with due dates in the fall. The only project I'm on the fence about is MS3. After Clue 5 was posted yesterday, I knew I wasn't going to knit it as designed, but go with a straight stole (as someone in the forums noted "Like a table runner.") My fence-sitting arises from the fact this is a 'knit-at-home-only-doing-nothing-else-including -watch-TV' project. Hmmm. I've just started Clue 2 and from what the discussion boards have been saying, things get easier from here on out. Hmmmm. I'm going to let this mull around a bit while I try to clean off my other needles.
Red Scarf 2 is done. Project Specs Cascade 220 remnants on #10 needles. Pattern: Stephanie's One-Row Handspun Scarf. Finished dimensions are 6.5" wide by 65" long.

Red Scarf 1 is about 65%:

These size 14 socks? Might be done by Christmas. They are for my neice's boyfriend - she got stuck in the process and I told her I would finish them. Before I heard he had size 14 feet. (And btw, Norma and Cookie rock the sock information! Thanks, girlies!)

Scarlet is progressing: I've just got to seam her up, finish the sleeve ribbing and tack on the neckline. I decided to do a bias neckline as described here. I think I will like it very much!
And to top it all off, I've been setting up housekeeping over here:
Now, if I could just get the upstairs painted, the housework done, and find time for a nap....










