Wednesday, February 15, 2006:
Whatever useless things these hands have done
It's early yet, but I realized today that I'm really looking forward to Lent. I love the depth of the liturgy in Lent, the way it tries to get us to flip over the rocks and see all the squirmy sightless things that live under there. The challenge is to see them with an understanding of grace, which is what holds the despair at bay. There's a little thrill in facing something squarely and realizing that the opportunity for transformation exists. Watching an old pattern or habit peel away and lose its power is a tiny bite-size Easter, an unexpected place for life to break out. I see it all the time, if I remember to look.
VERB: to engage in fanciful daydreaming OR to round up loose skeins of yarn 'captured' by my cats.
2.27.2006
Lenten thoughts
2.25.2006
Project Spectrum
My big March project is Jessica, using the Peruvian Alpaca from my stash. I'm also creating a pair of red earrings and my charity knit will be a pink hat using stash yarn.
I'm spending the next few days in preparation for the March 1 start date. This includes winding the alpaca, making necessary pattern adjustments for my body type, and sorting through my hat patterns.
Koigu has left the needles
The scarf pattern: 30 stitches on #3 needles (I used my Addi circs).
Row 1: Knit
Row 2: Purl
Row 3: YO K2tog across row
Row 4: Purl
There is a 3 stitch garter edge on all 4 edges of the scarf. Remember to double check your stitches before and after your (YO,K2tog) rows for the first few inches to make sure you aren't adding an extra stitch.
The glovelets are the tried and true 2x2 ribbing. Since my hands are broad across the knuckles, I cast on 60 stitches on #2 Brittany DPNs. I added a 6-stitch buttonhole at the 4.5" mark for the thumb, then continued in pattern until the glovelets measured 7" long.
2.20.2006
On your mark...
I'm eagerly planning for Project Spectrum. In my brain right now, I'm contemplating 1) knitting project for me, 1) beading project, and 1) charity knit in the monthly color scheme. I'll post more solidified ideas later. But let me just say, I'm preparing even as we speak (er..type).
And finally, here's Jack-a-Blope lurking behind the computer monitor. I'm pretty sure his "friend" Cinco was nearby and Jack was triangulating a surprise attack.
2.12.2006
My, what big slippers you have.
Just right!
2.09.2006
Miles to go before I slept
The Imagiknits scarf turned out quite well, too. I like the stripey effect of the yarn - it plays well with the herringbone stitch.
Don't make me break out the chocolate
2.07.2006
Moving along
2.05.2006
Found!
Meanwhile, over on the progress bar. CatMan is done and soaking for its block party. I pulled out the Leaves and Flowers Shawl and *sigh* frogged it. The Koigu was not happy. I've read different knitters contemplate "the yarn telling me what it wants to be". Well, this big-a**'d ball of Koigu has an identity crisis. I'm not willing to wait out the personality confusion: I love the colors and I want something to coordinate with my deep green winter coat. So I'm trying a wide scarf in a simple eyelet and stockinette pattern with (hopefully) enought left over for matching glovelets.
Check it out if you haven't already.
2.04.2006
Planning ahead
And to add insult to the snob, I picked up a skein of this: Lion Brand Magic Strips in 'Bright Spring'. Oddly enough, it appears to be the same colors, albeit brighter (and with the addition of white), as the Autumn Sunset. Hmmm... The recommended gauge for socks is given for #3 needles, but I'm gonna see if I can get away with my #2s.
I've also been bead shopping in Bristol (at Piperia). Unfortunately, Blogger is not cooperating by loading the pic. We'll save it for the next time.
1.28.2006
1.26.2006
Another one bites the snow!
1.21.2006
Finally, some FOs!

And the Bubbies 3 waiting to make their way to Fan in Ohio. All were done in Berroco Chinchilla on #4 Brittanys; the end Bubbies are Chocolat, the middle Bubbie is Fawn.
All this #2 and #4 knitting is causing some pain at the base of my thumbs. The CatMan's suggestion: Stop knitting for a while. And he was serious! Wha...?? The man is clearly not right in the head. I think I'll try some bigger needle projects before such a drastic measure.
1.18.2006
Getting closer
1.15.2006
Progress is just a word
1.11.2006
Dear TPTB*?
1.08.2006
One week



toodles off singing "People, let me tell ya 'bout my besssssst friend"
1.02.2006
The Good, the Bad, and the Ugly (not to mention, the Out-of-Control)
First the Good(s):
This yarn is for the Top-Down Coat Pattern I purchased from KYarns a few months back. It's a blend of merino, microfiber, and cashmere in a soft, celery green color.

These cute little sunny beads are an impulse buy for me. Cinco's being sly by trying to snag the larger bead (which I've already designated for a book thong).
My parents gave me a Barnes and Noble Gift Card (thank you!) This little guide is gonna save me a patch o'work when I'm looking for conversion tables, baby head circumferences, and other knitting miscellania.
This is the CatMan and our friend, D. at the top of their New Year's Eve Day hike. They are very very happy. A few hours from this photo? They will be very very sore.
The Bad:
Unpacking. Need I say more?

The Ugly:
The Logs of Meat. These are not raw, though they look it (here and in person). They are homecured beef and pork products, tasting remarkably like beef summer sausage. They were part of the sustenance for the boys' hike. They are also very very good. If you can get past the ugly.
The Out of Control:
CatMan Aran - (20 more inches, if I go to the length the CatMan has requested) Did I mention this will rot off his neck because he will not be allowed to remove it?
Java Socks - (1 down, the other at the point of heel gusset)
Leaves and Flowers Shawl - Knitted through row 30-something. Starting this in the car on the way to Albany yesterday just about drove me guano loco. Once I got some markers placed and altered the edge stitches to YO, K2 it was smoother sailing. It's on hold until I can enlarge the chart and make some notations for myself.
Bubbies - Have to be finished this month. I'm 1/2 way there.
Imagiknits Scarf - Relegated to car project
So that makes 5!?! projects on the needles to start the new year. Sounds like my resolution is to get the WIP list to a manageable number by the end of the month.










